To service offshore wind projects, two quays have been adapted to handle the unloading of components manufactured by suppliers and the initial installation of turbines.
Thanks to the piling under the quay permissible working loads in the loading quay area reach 50 t/m2..
- Depth of the fairway – 12.5 m,
- Width at the bottom of the approach track – 130 m,
- Total length of quays – 496 m, including:
- Quay No. 1, 250 m long, intended for unloading incoming components,
- Quay No. 2, 246 m long, intended for loading pre-assembled turbines;
- Area of storage facilities - approx. 16 ha.